NECESSITY OF WIRE ROPE REPLACEMENT IN CRANE LIFTING EQUIPMENT AFTER CHANGE OF CRANE OPERATIONAL PARAMETERS
 
More details
Hide details
1
Technical University of Košice, Slovak Republic
 
 
Publication date: 2017-06-01
 
 
Corresponding author
Martin Mantič   

Technical University of Košice, Letná č. 9, SK-04200 Košice, Slovak Republic
 
 
Adv. Sci. Technol. Res. J. 2017; 11(2):226-230
 
KEYWORDS
TOPICS
ABSTRACT
This article describes a specific expertise and evaluation process relating to a foundry crane, which is installed in a steel production factory. The main task was to analyse a possibility to increase lifting speed of the crane lifting mechanism in order to improve efficiency of the production process. The steel supporting structure of the given foundry crane was considered by means of the performed experimental measurements and calculations. The presented article describes the special experimental/analytical methodology, which was used for evaluation of the crane steel construction and crane mechanisms, namely the lifting mechanisms and travelling mechanisms. There are also explained the required modifications of the individual crane construction parts.
Journals System - logo
Scroll to top