PL EN
LOCKING THE MOVEMENT OF PERSONS ON THE BRIDGE CRANE
 
More details
Hide details
1
Technical University of Košice, Letná č. 9, SK-04200 Košice, Slovak Republic
 
 
Publication date: 2018-06-20
 
 
Corresponding author
Martin Mantič   

Technical University of Košice, Letná č. 9, SK-04200 Košice, Slovak Republic
 
 
Adv. Sci. Technol. Res. J. 2018; 12(2):260-265
 
KEYWORDS
TOPICS
ABSTRACT
This article describes the design of a horizontal rope system for increasing the safety of work and movement on a specific device operating in height. This system is designed to be installed on a conventional existing crane footbridge or crane track structure and this system enables a free pass along the rope, without unclamp of spring hook on prolongation rope. The calculation was made by non-linear dynamic FEM analysis.
Journals System - logo
Scroll to top