PL EN
INTEGRATION OF SHIP HULL ASSEMBLY SEQUENCE PLANNING, SCHEDULING AND BUDGETING
 
Więcej
Ukryj
1
Faculty of Maritime Technology and Transport, West Pomeranian University of Technology, Al. Piastów 41, 71-065 Szczecin, Poland
 
 
Data publikacji: 01-03-2015
 
 
Adv. Sci. Technol. Res. J. 2015; 9(25):12-19
 
SŁOWA KLUCZOWE
STRESZCZENIE
The specificity of the yard work requires the particularly careful treatment of the issues of scheduling and budgeting in the production planning processes. The article presents the method of analysis of the assembly sequence taking into account the duration of individual activities and the demand for resources. A method of the critical path and resource budgeting were used. Modelling of the assembly was performed using the acyclic graphs. It has been shown that the assembly sequences can have very different feasible budget regions. The proposed model is applied to the assembly processes of large-scale welded structures, including the hulls of ships. The presented computational examples have a simulation character. They show the usefulness of the model and the possibility to use it in a variety of analyses.
Journals System - logo
Scroll to top